West Route N. Hampton Fiber Installation – Dallas, Texas
Installation of 23 fiber‑optic ducts along N. Hampton Road in Dallas, Texas, performed as a subcontractor using directional drilling methods. Work was completed with two Vermeer 24×40 HDD rigs and a Ditch Witch AT32 to accommodate varying bore conditions while minimizing surface disruption.
Vacuum excavation trucks were utilized to safely daylight existing utilities and support drilling operations, including maintaining proper water supply for boring procedures. The project was executed in an active urban corridor with a strong focus on safety, coordination, and protection of existing infrastructure.
- Service Category: Fiber
- Location: Dallas, Texas

Service Benefits:
HDD provides a safer, faster way to bring fiber to active campuses—less surface disruption,
fewer closures, and a cleaner finish. Our school-site procedures keep students, staff, and
neighbors protected while we deliver reliable connectivity.
Verified locates & hydrovac daylighting to prevent strikes
Trenchless bores under drives & sidewalks—minimal disruption
Conduit, pull tape & markers installed to spec; separations maintained
Clean restoration and traffic/pedestrian control suited for schools
Inspection-ready closeout: photos, redlines/as-builts & test records